Andy's House (So far)
The older photo's are now further down the page.
May 08 All the tin on the outside, windows are all fitted and some lights working
Now to make the doors from scratch!!!
![]()
Mar 08 Russell the electrician The work kitchen with stove and sink
![]()
Feb 08 Internal walls are all lined with structural plywood
![]()
Jan 08 The outer layer of color bond is on Mar 08 Half of the cyclone bracing fitted
![]()
Nov 07 Wall insulation with custom scaffold Outer structural ply
![]()
Oct 07 Bathroom and toilet framing Master bedroom and big windows

Sept 07 Wall framings on ground floor Second floor wall framing

19th July 07 As long as you don't undo the wrong rope it's ok! A good 3D puzzle.
1st July 07 First of the hand railings on Start of the internal hand rails

The top stringers ready for assembly If the stairs look heavy it is because they are!

1st June 07 Side deck with generator on it Front deck is only missing the handrail now.
31st May 07 First floor, flooring nailed in place. Second floor, flooring nailed in place.
All the Tin installed on the roof. Tin on the roof ready for installation

27th April 07 Clip-Lock system for roof fixing (no holes in tin) Lane helping me move the tin onto the roof.

19th Mar 07 A swarm of bee's that decided my house was pretty cool Cutting poles with a chainsaw

About 1/3 of the way through the Battern's, a very slow process. The Roof Joists ready for the Facia to go on.

Walking on beams, who said I wasn't a balanced individual! Fixing the first two Roof Bearers in place

19th Dec 06 Nils helping lift some timber for the roof Nils and Rose, with second floor bearers and joists done
22nd Nov 06 Bearers for first floor up Lifting Bearers for second floor Attaching second floor bearers
31st Oct 06 Noah chaining a pole up at a safe distance Noah and I with one more pole to go
16th Oct 06 Lifting second pole into hole Jig for sliding pole into hole Noah giving me a hand concreting
11th Oct 06 10 Poles ready, about 12 tones Lifting pole onto trolley Getting pole up the hill
7th Sept 06 Letuce, Corn, Carrots, Broccoli, Snow Peas etc Some of the hard wood for the house about 10 tones
25th Aug 06 Bobcat digging Foundation holes for house Me in a hole, a 2m deep hole!
11th Aug 06 Lane and formwork Lane and Collin in action Russell, Todd, Scobes and I, a job well done
Framing ready for concrete Concrete set, now for the access

22nd April 06 Some of the lads positioning the first tank Todd, David, Andy, Nils, Rodney and Fenton
Note the fishing shirts smelling of Barra!

Two 5500 Gal water tanks Trusty Landy Tractor and first tank.

2nd Jan 06 The road partly done Pouring gravel by hand, as well as everything else

11th Oct 04 Some rocks are better left alone Looking down the road clearing
This one was in the driveway

It was actually worse than it looks. (Before) Fruit trees, Mango, Breadfruit, Carambola, Jackfruit, etc.

9th June 04 Andy, Bill, Emma and Rick Shed framing up
24th Feb 04 Clearing the shed pad Shed retaining wall